{"id":6668,"date":"2017-12-19T15:21:14","date_gmt":"2017-12-19T21:21:14","guid":{"rendered":"http:\/\/atlastransport.wpengine.com\/?post_type=project&p=6668"},"modified":"2025-03-06T09:36:44","modified_gmt":"2025-03-06T15:36:44","slug":"mills-peninsula-hospital-replacement-facility-2","status":"publish","type":"project","link":"https:\/\/www.oneatlas.com\/project\/mills-peninsula-hospital-replacement-facility-2\/","title":{"rendered":"Mills Peninsula Hospital Replacement Facility"},"content":{"rendered":"
This $618 million, 700,000 square foot hospital replacement project is one of the most innovative structural designs to ever pass through the Office of Statewide Health Planning and Development (OSHPD). The structural frame is supported on 176 base isolators fabricated at EPS\u2019s Vallejo Plant with Ò°²ÝÊÓƵapp quality assurance oversight.<\/p>\n
CONSTRUCTION COST: $618 MILLION<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":" This $618 million, 700,000 square foot hospital replacement project is one of the most innovative structural designs to ever pass through the Office of Statewide Health Planning and Development (OSHPD). The structural frame is supported on 176 base isolators fabricated at EPS\u2019s Vallejo Plant with Ò°²ÝÊÓƵapp quality assurance oversight. Over 9,000 tons of structural steel […]<\/p>\n","protected":false},"author":5,"featured_media":6467,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[52],"project_tag":[235,241,247],"class_list":["post-6668","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-healthcare","project_tag-construction-materials-testing-and-special-inspection","project_tag-quality-assurance-and-control","project_tag-non-destructive-testing"],"acf":[],"yoast_head":"\n